The Dorchester Career & Technology Center | Cambridge, Maryland

"Get the Flash Player" "to see this gallery."
  • Project Type: Institutional

Project Breakdown

Installation of two (2) standard construction entrances, 9,400 lineal feet of standard silt fence, eleven (11) inlet protection, demolition and removal of existing site structures, stripping topsoil, excavation and embankment, rough grading, installation of 3,040 lineal feet of HDPE Storm Drain, 274 lineal feet of RCP Storm Drain, 14 Nyoplast storm basins, 8 pre-cast storm inlets, installation of Emergency Outfall Structure, installation of 900 lineal feet of 8” sewer mains, installation of 6” service laterals and clean-outs, installation of 2 sewer manholes, installation of 600 lineal feet of 8” and 830 lineal feet of 10” water mains, installation of 6” water valves and box with fire line as well as 4 fire hydrants and water services, installation of 1,500 lineal feet of Curb and Gutter Type II, 5,500 lineal feet of Straight Faced Curb, 3,800 square feet of Monolithic Curb and Sidewalk, 31,570 square feet of 5” Sidewalk, 675 square feet of 6” Dumpster Pads, 7,216 square feet of 8” Concrete Fire Lane Pavement, Light Duty and Heavy Duty Pavement Sections, as well as Roto-Milling and Pavement Overlayment.